Electrical certificates explained: EIC, Minor Works and Part P

Quick answer

UK electrical work uses three main BS 7671 documents: an Electrical Installation Certificate (EIC) for new circuits, rewires and consumer unit changes; a Minor Works Certificate for small additions to existing circuits; and an EICR for checking existing wiring. In England, notifiable work also needs a Part P Building Regulations compliance certificate within 30 days.

On this page
  1. Which electrical certificate do I need?
  2. What does each certificate cover?
  3. How does certification work on a typical job?
  4. What are the deadlines and costs?
  5. Worked example: a kitchen job in Cardiff vs Bristol
  6. What are the common certificate mistakes?
  7. What software do electricians use to issue certificates?
  8. FAQs

Electricians in the UK issue a handful of different certificates, and homeowners, landlords and buyers' solicitors often mix them up. This guide explains the Electrical Installation Certificate (EIC), the Minor Works Certificate, the EICR and Part P notification, and how the rules change in Wales, Scotland and Northern Ireland.

Which electrical certificate do I need?

The main UK electrical certificates and when each is used (checked 12 Oct 2026)
DocumentUsed forWho issues itTypical example
Electrical Installation Certificate (EIC)New installations, new circuits, rewires, consumer unit replacementsThe electrician (or electricians) responsible for design, construction and inspectionNew cooker circuit, full rewire, new fuse board
Minor Electrical Installation Works CertificateAdditions and alterations that do not include a new circuitThe electrician who did the workExtra socket on a ring, moving a light switch, replacing a light fitting
Electrical Installation Condition Report (EICR)Checking the condition of an existing installationA competent inspectorLandlord's 5-yearly check, pre-purchase check
Building Regulations compliance certificate (Part P)Proof that notifiable work in a home meets Building Regulations (England and Wales)The installer's competent person scheme, or building controlConsumer unit change, new circuit, bathroom work
Danger noticeRecording a dangerous condition found on siteThe electricianExposed live parts found during other work

The EIC, Minor Works and EICR are model forms published with BS 7671, the IET Wiring Regulations. Scheme operators such as NICEIC and NAPIT issue their own branded versions. Since 15 April 2026, the forms have been updated for BS 7671 Amendment 4 (A4:2026).

What does each certificate cover?

Electrical Installation Certificate (EIC)

The EIC is the full certificate for new work. It records the design, the installation and the inspection and testing, with signatures for each (one person can sign all three). It includes a schedule of inspections and a schedule of test results for every new or altered circuit. Electricians often issue a simpler single-signature version for domestic work. Use an EIC for any new circuit, a rewire, or a consumer unit or distribution board replacement.

Minor Electrical Installation Works Certificate

The IET's A4:2026 model form is clear: it is "to be used only for minor electrical work which does not include the provision of a new circuit". Examples are adding a socket or light point to an existing circuit, or relocating a switch. It may also cover replacing accessories or light fittings, but "not for the replacement of consumer units, distribution boards or similar items". On the A4 form, end-to-end continuity tests are now recorded as r1-r1, rn-rn and r2-r2, according to NICEIC.

Electrical Installation Condition Report (EICR)

An EICR is a report, not a certificate of new work. It assesses an existing installation and codes faults C1, C2, C3 or FI. It is what landlords need every 5 years. Read our full EICR guide for the rules and deadlines.

Part P and Building Regulations

Part P of the Building Regulations covers electrical safety in homes in England and Wales. All electrical work in a home must meet it, but only some work is notifiable, meaning building control must be told. A registered competent person can self-certify. The homeowner then receives a Building Regulations compliance certificate, separate from the BS 7671 certificate.

Notifiable electrical work in homes: England vs Wales (checked 12 Oct 2026)
WorkEngland (Approved Document P, 2013)Wales (Approved Document P, 2006 with 2010 amendments)
New circuitNotifiableNotifiable
Consumer unit replacementNotifiableNotifiable
Work in a bathroom or shower room (special location)Additions or alterations notifiableNotifiable
Extending a circuit in a kitchenNot notifiableNotifiable
Outdoor lighting and power, garden wiringNot notifiable unless it is a new circuitNotifiable
Replacement, repair and maintenanceNot notifiableGenerally not notifiable

Scotland works differently. There is no Part P. Scotland uses building warrants under the Building (Scotland) Regulations 2004, and the Scottish Government notes that the system "is not based on types of electrical work". Rewiring and lighting work in flats and buildings over three storeys needs a warrant, while houses of up to two storeys are exempt. Work affecting a separating wall, such as recessed sockets, needs a warrant for all dwelling types. Approved Certifiers of Construction, working for an approved body, can self-certify warrant work. In Northern Ireland, building regulations are separate again, so check with your council's building control before notifiable-type work.

What other certificates might an electrician issue?

Beyond the three BS 7671 forms, specialist work comes with its own paperwork. Certificate apps list these separately, so it is worth knowing the names:

  • EV charger installation certificates: Tradecert lists four EV charger forms, and iCertifi includes an EV charger certificate. Amendment 4 also introduced RDC protective devices for EV charging, according to NICEIC.
  • Solar PV certificates: offered by Tradecert, iCertifi, EasyCert and NAPIT FastTest.
  • Fire alarm (BS 5839) and emergency lighting (BS 5266) certificates: these follow separate British Standards, not BS 7671. See our guide to fire alarm and emergency lighting certificates.
  • PAT records: portable appliance testing is not part of the fixed installation and is not covered by an EICR. Our PAT testing guide explains when it is needed.
  • Landlord's interim check and visual inspection forms: lighter checks between full inspections, offered in apps such as iCertifi. They do not replace the 5-yearly EICR.

What should a homeowner, buyer or landlord ask for?

If you are paying for electrical work, ask before the job starts which certificate you will get and whether the work is notifiable. A good electrician will tell you without being asked. When the work is finished you should receive the BS 7671 certificate (EIC or Minor Works) straight away, and, for notifiable work in England or Wales, a Building Regulations compliance certificate from the electrician's scheme a few weeks later. If you are buying a home, your solicitor may ask the seller for these for any recent rewire, consumer unit change or extension. Missing paperwork can usually be sorted, but it is slower and more expensive after the event, because building control or a third-party certifier may need to inspect the work. Landlords need one more thing: proof of any remedial work after an EICR, sent to the tenant and, in England, the council.

How does certification work on a typical job?

  1. Decide the certificate before you start. New circuit or board change: EIC. Small addition to an existing circuit: Minor Works.
  2. Check whether the work is notifiable. In England, new circuits, consumer unit changes and bathroom alterations are. In Wales, add kitchens and outdoor work. In Scotland, check whether a building warrant is needed.
  3. If you are not in a scheme, notify first. In England, a non-registered installer must notify building control before work begins, or appoint a registered third-party certifier before starting.
  4. Inspect and test. Record results on the schedule as you go. A tablet app saves rewriting later.
  5. Issue the BS 7671 certificate. Give the customer the EIC or Minor Works Certificate.
  6. Notify through your scheme. In England, a registered competent person must make sure the compliance certificate reaches the occupier and the building control body is notified within 30 days of finishing the work. NICEIC's online system can send the Building Control notification with the certificate.
  7. Keep copies. Customers will need them when they sell, and landlords need them as proof of remedial work.

What are the deadlines and costs?

  • 30 days: for a registered competent person in England to get the compliance certificate to the occupier and notify building control (Approved Document P, para 3.4).
  • 5 days: for an installer using a third-party certifier in England to tell the certifier the work is finished (para 3.6).
  • Before work starts: building notices from non-registered installers.
  • 28 days: for landlords in England to send proof of remedial work (an EIC, Minor Works Certificate or new satisfactory EICR) to the tenant and council after the work is done.

Notification fees depend on the scheme and are usually included in the electrician's price. Building control fees for a building notice are set by each council. For the cost of the EICR itself, see our EICR cost guide.

Worked example: a kitchen job in Cardiff vs Bristol

A customer wants two extra sockets added to the existing ring in their kitchen, plus a new radial circuit for an induction hob.

Certificates needed for the same kitchen job in England and Wales
Part of the jobBristol (England)Cardiff (Wales)
Two extra sockets on the existing kitchen ringMinor Works Certificate; not notifiableMinor Works Certificate; notifiable (kitchen circuit extension)
New radial circuit for the hobEIC; notifiable (new circuit)EIC; notifiable (new circuit)
Paperwork to the customerEIC, Minor Works, one compliance certificateEIC, Minor Works, compliance certificate covering both parts

An electrician can also cover the whole job on one EIC, because it includes a new circuit, and notify once. The difference matters most for smaller jobs: in Wales, adding a single kitchen socket is notifiable, while in England it is not.

Software cost: an electrician issuing 15 certificates a month on Sparkcerts (£12 a month for the whole firm after the first 3 jobs) pays 80p a certificate. On iCertifi's 12-month unlimited plan (£125.99 including VAT), 180 certificates a year is about 70p each.

What about electrical work in a rented home?

Landlords use these certificates in two ways. After an EICR, any remedial work comes back as a Minor Works Certificate or an EIC, which the landlord must send to the tenant and, in England, the council within 28 days of the work. And an EIC can stand in for an EICR in Scotland: the Scottish statutory guidance accepts an EIC issued in the last five years, as long as its next inspection date has not passed.

What are the common certificate mistakes?

  • Using Minor Works for a consumer unit change. The IET form rules this out. It needs an EIC.
  • Using Minor Works for a new circuit. Even a short new radial needs an EIC.
  • Forgetting to notify. The BS 7671 certificate is not the Part P certificate. Buyers' solicitors ask for both.
  • Applying English rules in Wales. Kitchen and garden work is notifiable in Wales.
  • Calling an EICR a "safety certificate". It is a condition report. A landlord who receives an unsatisfactory EICR does not have a "certificate" at all until the faults are fixed.
  • Issuing old forms. From 15 October 2026, NICEIC expects A4 certificates for work designed after that date.

What software do electricians use to issue certificates?

Certificate apps fill in the EIC, Minor Works and EICR forms on a phone or tablet, carry test results across schedules and email the PDF from site. Tradecert covers EIC, EICR, Minor Works, EV charger, fire alarm, emergency lighting, solar PV, PAT and danger notices from £18 a month. iCertifi lists 15 certificate types, including EIC, Minor Works, EICR and danger notices, for £125.99 a year including VAT. NAPIT members get FastTest (£195 ex VAT); NICEIC members can use NICEIC Online, which notifies Building Control too. For a side-by-side view, see our electrical certificate software comparison, and if you also need quotes, scheduling and invoicing, see our guide to software for electricians.

Our verdict

EIC for new circuits and board changes, Minor Works for small additions, EICR for existing installations, and a Part P notification on top for notifiable work in England and Wales. Electricians working on both sides of the Severn should learn the Welsh notifiable list, and everyone should be on A4:2026 forms now.

Frequently asked questions

What is the difference between an EIC and an EICR?

An EIC (Electrical Installation Certificate) is issued when new electrical work is installed, such as a new circuit, a rewire or a consumer unit replacement. It certifies that the new work meets BS 7671. An EICR (Electrical Installation Condition Report) is a report on the condition of an existing installation, used for periodic checks such as the 5-yearly landlord inspection.

When is a Minor Works Certificate used?

For additions and alterations that do not include a new circuit, such as adding a socket or light to an existing circuit or moving a switch. The IET's A4:2026 form says it may also cover replacing accessories or light fittings, but not consumer units or distribution boards. Anything bigger needs an EIC.

What is a Part P certificate?

It is the Building Regulations compliance certificate for notifiable electrical work in homes in England and Wales. A registered competent person (for example with NICEIC or NAPIT) self-certifies the work, and in England the homeowner receives the certificate within 30 days. It is separate from, and in addition to, the BS 7671 certificate.

What electrical work is notifiable under Part P?

In England: a new circuit, a consumer unit replacement, and any addition or alteration to circuits in a special location such as a bathroom zone. Wales still uses the older 2006 Approved Document P, which also makes extensions to kitchen circuits, outdoor work and some other jobs notifiable.

Does Scotland have Part P?

No. Scotland uses building warrants under the Building (Scotland) Regulations 2004. Whether electrical work needs a warrant depends on the building type: for example, rewiring a flat needs one, but rewiring a house of up to two storeys does not. Approved Certifiers of Construction can self-certify work that needs a warrant.

Can I get a certificate for DIY electrical work?

An electrician cannot sign an EIC for work they did not design, install and inspect. In England, if DIY work is notifiable, you must notify building control before you start. After the event, a registered third-party certifier or building control may inspect the work, which can mean opening up walls.

How long should I keep electrical certificates?

Keep them for the life of the installation, and pass them on when you sell. Buyers' solicitors often ask for Part P compliance certificates for any notifiable work. Landlords in Scotland must keep EICRs for six years, and in England until the next inspection is due.

Sources and checks

Prices, features and ratings were checked on 12 October 2026 against these sources. Software prices change often, so confirm on the vendor's site before you buy.

  1. GOV.UK: Approved Document P (2013 edition, England)
  2. Welsh Government: Approved Document P (2006 edition incorporating 2010 amendments, Wales)
  3. Scottish Government: Regulation of electricians in Scotland research report
  4. IET: BS 7671:2018+A4:2026 Minor Electrical Installation Works Certificate model form
  5. NICEIC: Understanding BS 7671 Amendment 4
  6. NICEIC: Electrical Installation Condition Reports
  7. NICEIC Online Certification
  8. GOV.UK: Electrical safety standards in the private and social rented sectors guidance
  9. Scottish Government: Repairing Standard statutory guidance (electrical)
  10. Tradecert electrical certificate types
  11. NAPIT FastTest
  12. Sparkcerts pricing
  13. iCertifi pricing
  14. Tysoft EasyCert