BS 7671 Amendment 4 (A4:2026): what changed

Quick answer

BS 7671:2018+A4:2026 (Amendment 4) was published on 15 April 2026 and the previous edition is withdrawn on 15 October 2026. It adds rules for battery storage, Power over Ethernet and functional earthing, revises medical locations, adds PNB earthing, and changes EICRs so FI no longer makes a report unsatisfactory. Certificate software must issue A4 forms.

On this page
  1. What is BS 7671 Amendment 4, in short?
  2. What changed in Amendment 4?
  3. What do electricians need to do?
  4. What will A4 cost you, and what is the deadline?
  5. Worked example: which version applies to which job?
  6. What mistakes are electricians making with A4?
  7. Which certificate apps are ready for A4?
  8. FAQs

Amendment 4 to the 18th Edition Wiring Regulations becomes the only current version on 15 October 2026. Here is what changed, the dates that matter, what it means for EICRs and certificates, and which certificate apps we found were already A4-ready when we checked on 12 October 2026.

What is BS 7671 Amendment 4, in short?

BS 7671 is the UK standard for electrical installations, published by the IET and BSI and known as the Wiring Regulations or the 18th Edition. Amendment 4, written BS 7671:2018+A4:2026 and nicknamed the Orange Book, updates it and absorbs Amendment 3 into the main text.

Key Amendment 4 dates (checked 12 Oct 2026)
DateWhat happensSource
15 January 2026Amendment 4 signed offIET and EAL
15 April 2026Published; can be used straight away. A4 model forms dated the same dayIET, NICEIC
15 October 2026BS 7671:2018+A2:2022+A3:2024 withdrawn; A4 becomes the current standard. NICEIC Online offers A4 forms onlyNICEIC
15 April 2027Last date to edit open A3 forms on NICEIC OnlineNICEIC

What changed in Amendment 4?

The IET lists four headline technical changes, and NICEIC adds several more that matter on day-to-day jobs.

New and revised sections

  • Stationary secondary batteries (new Chapter 57): rules for battery storage used to store and supply electricity in an installation. Relevant to anyone fitting home batteries alongside solar PV.
  • Functional earthing and functional equipotential bonding (new Section 545): for ICT equipment and systems.
  • Power over Ethernet (new Section 716): for PoE lighting, cameras and devices powered over data cables.
  • Medical locations (Section 710): a major revision, with a new schedule of test results for supplementary bonding conductor resistance.

Changes NICEIC highlights

  • PNB earthing: Protective Neutral Bonding systems are included for the first time, and PNB can be selected as an earthing arrangement on the forms.
  • RDC devices for EV charging: residual direct current protective devices are introduced for EV charging installations.
  • AFDD wording: "high rise residential buildings" replaces "higher risk residential buildings". The AFDD requirement itself is unchanged.
  • Bidirectional devices: recorded by British Standard only, with a comment box to note whether a device is bidirectional.

Changes to EICRs

This is the change that reaches landlords and homeowners. On A4 forms, observations are split into two parts. C1 and C2 (which make the result unsatisfactory) are separated from C3 and FI (which do not). The IET's Wiring Matters explains that FI now reads "further investigation is advised" rather than "required without delay", and that where FI is used "it does not result in an unsatisfactory outcome". NICEIC asks its contractors to explain this to clients. Our guide to EICR codes walks through an example.

Landlords in England, Wales, Scotland and Northern Ireland: the landlord rules point to BS 7671 but set their own deadlines. The GOV.UK guidance for England still says investigative work must be done within 28 days, and Scotland's guidance says FI items should be investigated as soon as practicable. Until those documents change, treat FI as something to act on. See our EICR guide for each nation's rules.

Changes to certificates and forms

  • Form references show the amendment: 18.3 for Amendment 3 and 18.4 for Amendment 4.
  • The declaration states the standard version: "BS 7671 2026" for A4 work, "BS 7671 2024" for A3 work.
  • Minor Works end-to-end resistance tests are recorded as r1-r1, rn-rn and r2-r2, replacing L/L, N/N and cpc/cpc.
  • Both electronic and handwritten forms remain available.

For what each form is for, see our guide to EIC, Minor Works and Part P.

Who is affected most?

How Amendment 4 affects different types of electrical work
You mainly doWhat to look at first
Domestic EICRs for landlords and agentsThe new two-part observations section and the FI change; explaining it to clients
Rewires and consumer unit changesNew A4 EIC forms, PNB as an earthing option, the "BS 7671 2026" declaration
Small additions and alterationsNew Minor Works test fields (r1-r1, rn-rn, r2-r2)
Solar PV and home batteriesNew Chapter 57 on stationary secondary batteries
EV chargersRDC protective devices for EV charging
Commercial fit-outs, data and smart buildingsSection 545 (functional earthing for ICT) and Section 716 (Power over Ethernet)
Hospitals, clinics, dental and vet practicesThe revised Section 710 and the new supplementary bonding test schedule
Flats in tall residential blocksThe renamed "high rise residential buildings" wording in the AFDD rules

For most domestic electricians, the day-to-day change is small: new forms, a new earthing option and a softer FI code. The bigger technical changes land on firms doing battery storage, EV charging, data and medical work. If that is you, the new chapters are worth reading in full rather than relying on summaries, because the IET says there are further changes "throughout all parts" beyond the headline items.

What do electricians need to do?

  1. Get access to the A4 book. NICEIC requires certified contractors to show access to A4 from 15 October 2026 to keep their certification.
  2. Update your certificate software. Check every app you use offers A4 forms, with PNB, the new observation layout and the new Minor Works test fields.
  3. Use A4 forms for new work. Anything designed after 15 October 2026 needs A4 certificates. All EICRs from that date should be issued to A4.
  4. Finish A3 jobs properly. Work designed to A3 before 15 October can still be certified to A3. Record the right standard in the declaration.
  5. Check contracts. NICEIC advises checking contract wording and discussing any design to a withdrawn standard with the client.
  6. Do the CPD. NICEIC expects you to be conversant with A4 changes that affect your work. Supervisors need an 18th Edition qualification, but an A4 upgrade course is not required.
  7. Brief landlord clients on FI. Explain that a report with FI only is now satisfactory, but they should still investigate within the landlord deadline.

What will A4 cost you, and what is the deadline?

The hard deadline is 15 October 2026. Costs fall into three areas: the book itself, any update course you choose, and your certificate software. Most subscription apps include A4 updates in the subscription. One-off licences may need a support renewal. EasyCert, for example, sells a one-off EasyCert Pro licence at £174.95 with a separate 12-month Customer Care renewal (the renewal price is not shown on its site), and Clik's NICEIC Cert Software at £280 ex VAT includes the first year of updates and support. If your software is out of support, budget for renewal before 15 October.

Worked example: which version applies to which job?

Which BS 7671 version to certify against, based on NICEIC guidance
JobDesignedCompletedCertify to
Kitchen rewire2 October 2026 (to A3)22 October 2026A3 is allowed, declaration "BS 7671 2024"
Consumer unit change20 October 202623 October 2026A4, declaration "BS 7671 2026"
Landlord EICRn/a16 October 2026A4 form; FI does not make it unsatisfactory
Battery storage with solar PV1 May 2026 (to A4)1 June 2026A4 (allowed from 15 April 2026), including new Chapter 57

Software maths: if your one-off licence is out of support and you switch to Tradecert from £18 a month, that is £216 a year. Switching to iCertifi's 12-month unlimited plan costs £125.99 including VAT. A NAPIT member renewing FastTest pays £195 ex VAT (£234 inc VAT).

What if a client asks for an A3 design after 15 October?

NICEIC advises checking the contract wording and talking to the client about any design to a withdrawn standard. In practice, a design finished before 15 October 2026 can still be signed off to A3 afterwards, but a new design started after that date should follow A4. If a client's specification still names the 2024 edition, raise it in writing before you start, so there is no argument at handover about which version the certificate should state.

What mistakes are electricians making with A4?

  • Assuming software updated itself. Check the form footer shows 18.4 and the declaration reads "BS 7671 2026".
  • Telling landlords FI can be ignored. A4 makes FI advisory, but landlord deadlines still apply.
  • Thinking it is the 19th Edition. It is still the 18th Edition, amended.
  • Booking an unnecessary requalification. NICEIC does not require an A4 upgrade for supervisors, although CPD is expected.
  • Using A3 forms for new designs after 15 October. Only work designed to A3 before that date can still be certified to A3.

Which certificate apps are ready for A4?

A4:2026 readiness of electrical certificate software. Prices checked 12 Oct 2026
AppA4:2026 statusPrice
TradecertYes: "BS7671 A4: 2026" on its certificate pages; certificates default to A4From £18 a month ex VAT (per Tradecert's homepage)
iCertifiYes (App Store listing)£125.99 a year unlimited, includes VAT
EasyCert (Tysoft)Yes: "updated to BS7671:2018 Amendment 4 2026"£174.95 one-off (VAT treatment not stated)
NAPIT FastTestYes: BS 7671:2018+A4:2026£195 ex VAT (£234 inc VAT)
NICEIC Online (NOCS)A4 forms only from 15 Oct 2026Pay per certificate, no platform fee
Pro CertsYes (version notes dated 2 July 2026)£9.99 a month (App Store price)
Clik NICEIC Cert Software"Supports the latest wiring regulations" (amendment not named)£280 ex VAT (£336 inc VAT)

For full reviews of each option, see our electrical certificate software comparison.

Our verdict

The 15 October 2026 switch is mostly a paperwork change for domestic electricians: new forms, PNB and a softer FI. Make sure your app is on A4 now, buy or access the book, and brief landlord clients that FI is advisory under BS 7671 but still on their legal to-do list.

Frequently asked questions

When does Amendment 4 come into force?

It could be used from publication on 15 April 2026. The previous version, BS 7671:2018+A2:2022+A3:2024, is withdrawn on 15 October 2026, when A4 becomes the current standard. NICEIC says designs completed before 15 October 2026 can still be signed off to the previous standard after that date.

Is Amendment 4 the 19th Edition?

No. A4:2026 is still the 18th Edition, BS 7671:2018, with a fourth amendment. It also absorbs Amendment 3 (2024) into the main document. Electricians still refer to it as the 18th Edition.

Do I need to retake my 18th Edition qualification?

NICEIC says supervisors are expected to hold an 18th Edition qualification, but upgrading it to A4 is not required for NICEIC certification. You must have access to the A4 book from 15 October 2026 and stay up to date through CPD. Training providers such as EAL are updating their courses to A4.

What changed on EICRs in Amendment 4?

Observations are split into two parts. FI (further investigation) and C3 are separated from C1 and C2, so FI no longer makes an installation unsatisfactory, and the words 'without delay' have gone. Landlords in England should note that the GOV.UK guidance still sets a 28-day deadline for investigative work.

Do my old A3 certificates still count?

Yes. Certificates issued correctly before the withdrawal date stay valid. NICEIC says A3 handwritten certificates can still be used for work designed to A3 before 15 October 2026, and open A3 forms on NICEIC Online can be edited until 15 April 2027. New work designed after 15 October should go on A4 forms.

Has the AFDD requirement changed?

Not in substance. NICEIC says the term 'higher risk residential buildings' is replaced by 'high rise residential buildings' in the arc fault detection device context, but the AFDD requirement itself is unchanged.

Sources and checks

Prices, features and ratings were checked on 12 October 2026 against these sources. Software prices change often, so confirm on the vendor's site before you buy.

  1. Tradecert homepage (pricing summary)
  2. IET press release: IET and BSI publish Amendment 4:2026 to BS 7671:2018
  3. NICEIC: Understanding BS 7671 Amendment 4
  4. IET Wiring Matters: Further investigation (July 2026)
  5. IET: A4:2026 Minor Electrical Installation Works Certificate model form
  6. EAL: BS 7671 Amendment 4 key changes explained
  7. Electrical Contracting News: NICEIC responds to Amendment 4
  8. NICEIC Online Certification
  9. GOV.UK: Electrical safety standards in the private and social rented sectors guidance
  10. Tradecert electrical certification software
  11. iCertifi on the UK App Store
  12. Tysoft EasyCert
  13. NAPIT FastTest
  14. Pro Certs on the UK App Store
  15. NICEIC shop: Clik NICEIC Cert Software